For news TAP HERE and scroll down
DSCN3518.JPG
Rocket KitLOC-Hi-Tech H45
Rating95.0
2 users
Skill5
Length53.00"
134.62cm
Diameter2.63"
6.68cm
Weight3.29lbs
1.49kg
Parachute24"
60.96cm
Drogue18"
45.72cm
Motor Mount38mm
DeploymentDual

HI-TECH II - REB.

Description

After a ballistic re entry the first HiTech was actually completely destroyed, except for the fincan and fins, They were still in great shape, so I decide to rebuild the original HiTech 45 rocket.

Update 07/08/2016 - Started to rebuild the HiTech II, the parts from LOC precision came in today, actually I got the order twice, which was convenient because I needed a 14" upper bay anyway ! Which I forgot to order. Cut a 24" body tube and a 15" upper part. Used the coupler for the body to the fin can assembly. Also cut the lower part of the Nose Cone which will be inserted inside with a bulkhead for strength and an eye bolt. So far so good, will continue in the next few day and fiberglass the body tube and fins again !

Update 07/09/2016 - Did some more work on the nose cone, inserted the end inside and eye-bold with rocket poxy, also left over rocket poxy went on the damage fin for more strength. Also put some epoxy inside the Av Bay and installed rims on both sides.

Update 07/10/2016 - Did some bulkheads work in and out bulkhead, drilled he holes for the eye bolts and the rods. Need one more threaded rod so that will be done. Made the sled already and the setup drawn out, the switch will be in the middle between the battery and the stratologger. Seems I have all the wiring also for the connections.

Update 07/11/2016 - Started Fiber glassing the rocket - upper and lower air-frame. And again epoxy in the av Bay to make that more solid. Also pored some epoxy in the nose cone. Fins are halfway glassed past the fillets, That rocket was already glassed before.

Update 07/13/2016 - Did a laminating epoxy coat with micro balloons today, sanding when dry.

Update 07/17/2026 - Found the energy today to sand with 150 Pro grit and prime the rocket, After a Sunday yard work... Looks great....the rocket also..

Update 07/18/2016 - Sanded the rocket, put some primer on it again, let dry and sanded again, then used the heat paint on the whole rocket, let dry and then some more light sanding. After this whole stuff I spayed the first gray color coat on the whole rocket, that will dry overnight and then the while parts... Looks kinda glossy and cool already !

Update 07/19/2016 - Finished the white paint parts on the rocket, looks all great, After a few days, polish and waxing... And still working on Av Bay setup and parts.

Update 07/20/2016 - Installed the Av Bay stop ring in the upper section, also put CA glue in the top of the booster and the upper section just to enforce those parts.

Update 07/21/2016 - Had some left over epoxy so I did epoxy the inside of the booster and the upper section, just for charge/blast protection.

Update 07/24/2016 - Worked on the Ab Bay. sled and guide rails... The first attempt had epoxy inside the hollow tubes and got stuck solid so I had to take it apart and buy new rods. Cut the rods in size, did the epoxy thing and glued them on the sled and they came out just right. Had to put a little oil inside the brass tubes because it was indeed a little tough to slide, but still it's all good and perfect now. Tried the iphone with tape and it seems to fit perfect. Now have to order the Stratologger and put it all on the sled and drill the final holes like, vent holes, screws holes/view-porthole and sheer pin holes.

Update 07/27/2016 - Just polished and waxed the rocket today. Nothing more, still have to order the stratologger....

Update 07/28/2016 - Drilled the screw holes (3) and venting holes for stratologger (4) and 2 additional vent holes in upper bay and lower booster for separation.

Update 08/05/2016 - did some work on the Av Bay, The added fiberglass to keep the battery and iphone in place seems to work great. Painted all in primer grey. Also added a round tube on the sled for the switch to fit in. Actually soldered the terminals of the switch and glued the switch in place in kinda low profile to fit the curving of the av Bay. Then put a dot of epoxy on the terminals and also on the stratologger screw set bottom part... when all is dry then I will continue to connect the terminals.

Update 08/21/2016 - Redid the sled setup, due to a miss connection of the switch. All assembled and connected and working great. All glued in place and working properly. Still need to drill the window and switch holes.

Update 08/29/2016 - Window drilled out and also switch hole, had to do it over again because it did not line up properly, used rocket poxy to fill it up and sanding down, Also painted the area again, all came out smooth! This rocket is ready to go !!

Update 01/28/2017 - Replaced the Main shock cord with a new one only 10 feet long, the drogue chock-cord is 15 feet long.


Charges: Drogue 0.8 grams

Charges: Main 0.8 grams

 

Parachutes: main - 30"

Parachute: drogue - 18"

 

 

Summary

Total Launches2 Highest Altitude3600 ft
1097.28m
Cumulative Altitude6844 ft
2086.05m
Total Fail0 Highest Velocity465 MPH
748.65km/h
Average Altitude3422 ft
1043.03m
Average MotorIAverage Thrust230Total Thrust461
Motor SumJMotor Failure0 Average Speed460 MPH
740.60km/h
Averages & cumulative are calculated if there are actual values present, not just estimated. None of the averages or weighted. Please do not populate actual values with estimates.
# = Number of Launches  ? = Estimated

Launches

DateTitleLikesWeight#StatusAltitudeVelocityMotor
IMG_9985 B.jpg 2017-11-12 06:27:00Z
HI-TECH II - REB.- SECOND FLIGHT
Like 3.29lb.
1.49kg
1 Partial 3244 ft
988.77m
?3976 ft
?1211.88m
455 MPH
732.55km/h
?440 MPH
?708.40km/h
I236-17-BS
Fredy HiTech.jpg 2016-09-10 16:17:00Z
HI-TECH II - REB.- FIRST FLIGHT
Like 3.29lb.
1.49kg
1 Success 3600 ft
1097.28m
?4230 ft
?1289.30m
465 MPH
748.65km/h
?448 MPH
?721.28km/h
I223-14-SKIDMARK

Images

DSCN3219.JPG
Like
DSCN3221.JPG
Like
DSCN3222.JPG
Like
DSCN3223.JPG
Like
DSCN3224.JPG
Like
DSCN3225.JPG
Like
DSCN3226.JPG
Like
DSCN3227.JPG
Like
DSCN3228.JPG
Like
DSCN3229.JPG
Like
DSCN3230.JPG
Like
DSCN3232.JPG
Like
DSCN3233.JPG
Like
DSCN3234.JPG
Like
DSCN3235.JPG
Like
DSCN3236.JPG
Like
DSCN3237.JPG
Like
DSCN3238.JPG
Like
DSCN3257.JPG
Like
DSCN3448.JPG
Like
DSCN3449.JPG
Like
DSCN3450.JPG
Like
DSCN3451.JPG
Like
DSCN3452.JPG
Like
DSCN3453.JPG
Like
DSCN3454.JPG
Like
DSCN3455.JPG
Like
DSCN3456.JPG
Like
DSCN3457.JPG
Like
DSCN3458.JPG
Like
DSCN3459.JPG
Like
DSCN3460.JPG
Like
DSCN3461.JPG
Like
DSCN3462.JPG
Like
DSCN3476.JPG
Like
DSCN3477.JPG
Like
DSCN3478.JPG
Like
IMG_6241.JPG
Like
IMG_6242.JPG
Like
IMG_6243.JPG
Like
IMG_6244.JPG
Like
IMG_6260.JPG
Like
IMG_6261.JPG
Like
DSCN3498.JPG
Like
DSCN3499.JPG
Like
DSCN3500.JPG
Like
DSCN3501.JPG
Like
DSCN3502.JPG
Like
DSCN3503.JPG
Like
DSCN3512.JPG
Like